Events, awards

• September 2021 – Presentation of laser cleaning technology for the Provincial Conservator of Monuments at the delegation in Legnica.
• October 2021 – “RENOWATOR 2020” award from the hands of the Local Government Conservators of Monuments for the best initiative in the field of protection and care of monuments, obtained at the 19th European Congress of Renovation Information.
• November 2021 – Lecture on laser cleaning for the Faculty of Wood Technology of the Warsaw University of Life Sciences.
• December 2021 – Lecture on laser cleaning for the Office of the Capital Conservator of Monuments in Warsaw.
• September 2022 – Participation in the scientific conference “LACONA” (Lasers in the conservation of works of art) in Florence.
• October 2022 – “Renovator 2022” distinction for the entirety of achievements in the renovation of historic buildings at the 20th European Congress of Renovation Information.
• May 2023 – Lecture on laser cleaning technology for students of conservation from the Academy of Fine Arts in Krakow and laser cleaning of three diploma objects in cooperation with the university:
o Laser cleaning of 15th-century polychrome sandstone bas-reliefs from the Silesian Piast Museum in Brzeg.
o Laser cleaning of a 15th-century polychrome sandstone baptismal font from the Silesian Piast Museum in Brzeg.
o Laser cleaning of a wooden figure of Nepomucen.
• June 2023 – Participation in the Heritage Security Congress in Gdynia and giving a lecture on laser technology.

Year 2020
• June – Cleaning of the sandstone pulpit in the Cathedral of St. Peter and Paul in Legnica.
• July – Cleaning two stone entrance portals to St. Anne's Church in Lubartów.
• July – September – Cleaning the red brick elevation of the Maritime Office in Szczecin.
• August – Cleaning two sets of stone sculptures on the roof of the Cultural Center in Zgorzelec.
• October – Cleaning sandstone fireplaces and woodwork in the castle in Lewków.
• October – Cleaning a sandstone sculpture on the elevation of a tenement house in Wrocław.
• October – Cleaning the door joinery of the castle in Moszna.
• November – Cleaning the neo-Gothic brick framework of St. Anne's Church in Ząbkowice Śląskie.
• December – Cleaning the terrazzo elevation of the Racławice Panorama in Wrocław.

Year 2021
• January – Cleaning the terrazzo elevation of the Racławice Panorama in Wrocław.
• February–March – Cleaning of sandstone floors in the Augustinian Abbey in Żagań.
• April – Cleaning of sandstone architectural details of the elevation in the Augustinian Abbey in Żagań.
• May – Cleaning of the floor of black marble tiles in the church.
• May–June – Cleaning of the red brick elevation of an old village house in Swołowo.
• June – Cleaning of the sandstone sculpture of St. Nepomuk in Nysa.
• June – Cleaning of the sandstone sculpture of St. Nepomuk in Kłodzko.
• July – Cleaning of the wooden ceilings of the Szczecin Voivodeship Office.
• July – Cleaning of the sandstone pinnacles on the roof of the Roman Catholic Church of St. Mary Magdalene in Krzydłowice.
• July – Cleaning of the sandstone tombstone of Duchess Anna Żagańska in the parish church of St. Anna in Ząbkowice Śląskie.
• August – Cleaning the interior woodwork of the hall in the MAK Museum in Vienna.
• August – Cleaning four sets of stone sculptures on the roof of the Culture Centre in Zgorzelec – part 2.
• August – Cleaning two entrance portals to the Castle of the Dukes of Oleśnica in Oleśnica.
• September – Cleaning the sandstone sculpture of St. Nepomuk in Tyniec on the Ślezajt River.
• September – Cleaning the red brick elevation of the Church of St. Joseph in Koszalin.
• October – Cleaning the entrance gate and architectural details made of sandstone in Bytom Odrzański.
• October – Cleaning the sandstone epitaph in the Church of St. Michael the Archangel in Długołęka.
• October – Cleaning the sandstone sculpture in the Church of the Transfiguration of the Lord in Warsaw.
• October – December – Cleaning the red brick facade of the Szczecin Cultural Center.
• October – Cleaning the main entrance gate made of Gothic brick of the Provincial Office for the Protection of Monuments in Poznań.
• November – Cleaning the wooden hallway and entrance door of an old apartment building in Krakow.
• November – Cleaning the polychrome ceiling of the castle in Ząbkowice Śląskie.
• December – Cleaning the interior joinery of a historic villa in Upper Sopot.

Year 2022
• January – February – Cleaning the interior joinery of a historic villa in Upper Sopot.
• March – Cleaning the brick facade of the Old Printing House in Szczecin.
• April – Cleaning the sandstone fireplaces in the castle in Brive-la-Gaillarde.
• April – May – Cleaning the metal decorations on the roof of the Cathedral of La Major in Marseille.
• May – Cleaning of the sandstone bas-relief on the elevation of the Parish of St. Jadwiga of Silesia in Skoroszyce.
• May – Cleaning of the wooden pulpit in the Church of the Transfiguration of the Lord in Lubań.
• May – Cleaning wooden Dutch furniture in the conservation studio.
• June – Cleaning of architectural details made of sandstone at the Pierre de Fermat College in Toulouse.
• August – Cleaning of door frames and sidelights in the building of the Manufaktura Office in Łódź.
• August – Cleaning of architectural details made of sandstone on the tower of the St. Barbara Church in Gdańsk.
• August – Cleaning of wooden doors in the Karl und Gisella Lanz Villa in Mannheim-Oststadt.
• August – Cleaning of four sandstone epitaph slabs in the church in Wołów.
• August – Cleaning of the sandstone figure of Nepomucen in the park in Ruda Śląska.
• September – Cleaning of the sandstone obelisk in front of the church in Kluczbork.
• September – Cleaning of wooden elements of the staircase of the palace in Śląskie Pawłowice in the Czech Republic.
• September – Cleaning of 13th century Romanesque sandstone portals in the Cistercian Abbey in Jędrzejów.
• September – Cleaning of the wooden interior of the Walnut Room in Villa Karl und Gisella Lanz in Mannheim-Oststadt.
• October – Cleaning of the interior red brick walls in the WNMP collegiate church in Głogów.
• October – Cleaning of the brick facade of the Library building in Słupsk.
• November – Cleaning of the granite stairs and sandstone entrance portal to the courthouse in Słupsk.
• November – Removal of graffiti from the brick wall of the Police building in Kozienice.
• December – Laser cleaning tests of polychromes in the church in Les Valaynes.

Year 2023
• January – Cleaning of stone details and sandstone sculptures on the top of the facade of the Sailor's House in Gdańsk.
• January–February – Cleaning limestone columns in the Notre-Dame Cathedral in Paris.
• February – Cleaning the stone Romanesque portal at the Norbertine Sisters' monastery in Krakow.
• February–March – Cleaning wall polychromes in the church in Les Valaynes.
• March – Laser cleaning of the sandstone facade on Plac Konstytucji in Warsaw.
• March – Graffiti removal from the above-ground garage in Warsaw.
• March – Laser cleaning tests of the facade of the Home Office building in London.
• March – Cleaning of wooden internal doors in Villa Karl und Gisella Lanz in Mannheim-Oststadt.
• April – Cleaning of limestone walls and columns in the Notre-Dame Cathedral in Paris.
• April – Cleaning of paint from the brick walls of the chapel in the Church of St. Michael the Archangel in Wrocław.
• April – Cleaning a wooden wardrobe from the Marshal's Office in Łódź.
• May – Cleaning a sandstone sculpture of Christ in Kościan.
• May – Cleaning a sandstone sculpture in front of the church in Gryżyn.
• May – Cleaning a sandstone tombstone in the Cistercian Abbey in Lubiąż.
• May – Removing a layer of shellac and metal slag from a wooden altar in Lubań.
• May – Cleaning diploma objects at the Academy of Fine Arts in Krakow.
• May – Cleaning the metal fountain "Kryształ" on the market square in Krakow.
• May – June – Cleaning the brick facade of the Public Library in Słupsk.
• June – Cleaning tombstones in the cemetery in Biała Podlaska.
• June – Cleaning sandstone bas-reliefs on two Stations of the Cross in Reszel.
• June – Cleaning sandstone keystones in a historic restaurant on the market square in Wrocław.
• June – Cleaning the brick walls of the staircase of the old brewery on Grunwaldzki Square in Wrocław.
• June – Cleaning the brick elevation of the Lighthouse in Niechorze.
• June – Cleaning the alabaster tombstone of Batory in Barczewo.
• June – Cleaning the limestone walls and columns in the Notre-Dame Cathedral in Paris.
• July – Cleaning the sgraffito elevation of an old house in Warsaw.
• July – Cleaning the columns and window bands made of sandstone of a villa in Konstancin-Jeziorna.
• July – Cleaning the stone details and the entrance portal of the Sailor's House in Gdańsk.
• July – Cleaning the window bands on the elevation of a historic tenement house on Zamkowa Street in Elbląg.
• July – Cleaning the pre-war entrance portal made of sandstone and the wooden doors of a tenement house on Piwna Street in Warsaw.
• July – August – Cleaning the sandstone facade of the Siemens building in Łódź.
• August – Cleaning the wooden facade of the church in Krzeczów.
• August – Cleaning the 3rd century triumphal arch in Reims.
• August – Cleaning the sandstone lions in front of the Presidential Palace in Warsaw.
• September – Cleaning the stone details on the facade of the 10th arrondissement mayor's office in Paris.
• September – Cleaning the stone tympanum on the facade of the cathedral in Nîmes.
• September – Cleaning the sculpture of Mary in front of the cathedral on Ostrów Tumski in Wrocław.
• September – Cleaning the wooden stalls in the Benedictine Abbey in Tyniec.
• September – Cleaning the limestone bas-reliefs on the facade of the building on Piękna Street in Warsaw.
• September – Cleaning of the limestone sculpture of Christ the Sorrowful from the roof of the Boim Chapel in Lviv.
• September – Cleaning of the brick facade of the primary school in Drawsko.
• October – Cleaning of the soldering furnace in control board factory.
• October – Cleaning the bas-reliefs of the Lviv Gate in Zamość.
• October – Cleaning the metal decorations on the dome of the La Major Cathedral in Marseille.
• October – Cleaning the sandstone sculptures on the facade of the La Major Cathedral in Marseille.
• October – Cleaning the wooden sculptures on the Mogiła in Krakow.
• November – Cleaning the wooden doors of the church in Romania.
• November – Cleaning the wooden pews from the church in Toruń.
• December – Removing graffiti from the plasters of the barracks at the Auschwitz Museum.
• December – Removing secondary paint layers from the tabernacle.
• December – Cleaning the wooden floor of the choir of the church in Lubin.

Year 2024
• January – Cleaning the wooden side altar in the church in Niwiska.
• January – Cleaning the details of the wooden altar in the church in Lublin.
• February – Cleaning the sculpture of St. Nepomuk on the market square in Toszek.
• February – Cleaning the wooden doors of a villa in Germany.
• March – Cleaning the sandstone facade in Arles, France.
• March – Cleaning the soldering furnace in the electronic circuit board factory.
• March – Cleaning the tower of the entrance gate to the city of Avignon, France.
• March – Cleaning the sandstone figures on the facade of the church in Świdnica.
• April – Cleaning the monument to the insurgents in Wadowice.
• April – Cleaning the alabaster entrance portal and alabaster details of the church in Krakow.
• April – Cleaning the sandstone fountain in Wschowa.
• April – Cleaning the polychrome limestone walls and sandstone tombstone in the Cistercian Abbey in Jędrzejów.
• April–June – Cleaning the brick elevation of the Trumpet Call Tower of the Basilica of St. Mary in Krakow.
• April – Cleaning the terrazzo band and removing graffiti from an apartment block in Warsaw.
• May – Attempts at cleaning the limestone elevation of the Museum of Human Rights in Winnipeg, Canada.
• May – Cleaning the wooden stalls at Mogiła in Krakow.
• May – Cleaning the brick elevation of the clinic in Wroclaw.
• May – Cleaning the wooden entrance doors to the church in Lyon, France.
• June – Cleaning the stucco altar in the Church of St. John the Baptist in Legnica.
• June – Cleaning the sandstone sculpture of the Crucified Christ in Bielsko-Biała.
• June – Cleaning the sandstone dormers in the palace in Goszcz.
• June – Cleaning the sandstone tombstones at the Jewish Cemetery in Warsaw.
• June – Cleaning of two sculptures from the Stations of the Cross in Reszel.
• June – Cleaning of tombstones in the cemetery in Biała Podlaska.
• June – July – Cleaning of the polychrome vaults of the church in Wąsosz.